OPINION: The Cost of Orthodoxy


Pulling Nigeria’s ailing economy from the brink calls for a radical improvement in efficiency within its oil & gas industry, writes Ofserv CEO Dimeji Bassir who presents opportunities to cut down the cost of production within Africa’s biggest oil market.

To quote Joel Barker in The Business of Paradigms “It’s so easy to say no to a new idea. After all, new ideas cause change; they disrupt the status quo. They take people out of their comfort zones and create uncertainty… Plus, it is less work to do things the way we have always done it……less work, maybe. Costly, definitely”

New ideas are resisted from greasy rig floors in the Niger Delta swamps to cushy business offices and conference rooms in regulator’s offices in Abuja; each, with very prohibitive costs of inaction.

Yet it’s business as usual in Nigeria’s oil industry despite current economic realities in the country, which provide the impetus for a radical transformation of its cost base. Pulling the ailing economy from the brink calls for a radical improvement in efficiency within its mainstay industry. Dwindling daily production and significantly reduced foreign exchange earnings, and foreign reserves, establishes the urgency to drive down unit cost per barrel of oil produced.

Simply stated, Today’s ‘Good’ is tomorrow’s ‘Not good enough’ and what sets us apart today will be the baseline tomorrow. The future belongs to those who act with urgency and foresight.

A huge, yet untapped opportunity

Successful upstream operations is underpinned by the ability to balance the trio of cost-schedule- production and maximise NPV, i.e. produce the most barrels in the quickest manner possible at the cheapest mean cost across a portfolio of assets.

Incremental improvement in well delivery (drilling & completion) efficiency in the US had characterised the shale oil boom which effectively began in 2007. Efficiency gains cut well costs by a third and reduced cost per barrel by 75% in the decade between 2007 and 2017. In effect, America became an oil and gas power house within this period, doubled US Shale production and tripled total daily oil output.

In Nigeria, the oil and gas industry is the largest revenue contributor to the Nigerian economy but production has declined by 40% from 2010 to date. Declining oil production presents major revenue challenges and precipitates chronic macroeconomic crisis in the short to medium term.

Dimeji Bassir

Reducing unit production costs by driving down well delivery costs presents an untapped opportunity to increase government earnings & reduce its fiscal deficit.

Being the most complex, costly and highly specialised upstream development activity which easily accounts for up to 60% of oilfield development CAPEX, drilling presents a unique opportunity to reduce the cost of oil production.

For this reason, in the early eighties, drilling engineers and other personnel operating in the UK’s North Sea recognised the need to learn from each other and compare performances across their respective drilling operations. This led to the formation of the drilling performance review (DPR) in 1989, a drilling benchmarking club. Most international operators who are value-driven continue to subscribe to the DPR till this day for the inherent benefit to their global operations and enterprise’s financial performance.

In general, up to 60% of drilling time goes to Non-productive time (NPT) and inefficiencies which is known in drilling parlance as invisible lost time (ILT). The cost of ILTs, being an invisible factor, to the Nigerian oil industry is in the order of billions of dollars overspent annually. Improving drilling performance therefore is an enabler to reducing cost of oil production. Lower drilling costs stimulates more drilling activities which in turn increases production and reduces unit production costs.

You can’t improve what you don’t measure

Drilling performance in Nigeria is laden with tremendous inefficiencies. An indicative benchmark of an average Nigerian, and similar North American well reveals significant underperformance in the Nigerian well as measured by days to drill a 10,000 feet well. A 10,000 feet well routinely delivered in 10 days in North America could take as long as 85 days in Nigeria. This disparity is surmised to be causative of the consistently high well delivery cost in Nigeria. Disproportionately long well durations delays time to market (deferred production), reduces project NPV – costly wells reduces the number of profitable opportunities – which in turn reduces rig activities and associated demand for services.

By top down estimates, the industry spends circa $11.4 billion to produce 1.25 million barrels daily and approximately $6 billion in drilling wells. A 30% performance gap between the authorised expenditure (budget) and actual costs as gleaned from an analysis of Nigerian wells represents a $1.8 billion a year opportunity.

The relentless pursuit of excellence in well delivery begins with establishing key indicators which must be tracked with rigour and provides indication of drilling performance and efficiency trends.

An excellent drilling efficiency metric commonly tracked is the dollar spend per reservoir foot of hole. US-based oil services research firm Spears & Associates, Inc. looking at this metric in US land operations from 2006 to date showed the cost of a foot of exposed reservoir falling by 75% in over a decade when considering what was paid to the contract driller. Similarly, the directional driller cost per exposed reservoir foot fell from $45 to $35, a decrease of 25%.

In addition to the reduced cost per barrel, other implications of drilling efficiency gains break down as follows:

  1. The price of contracting a rig in 2006 is now the price of four rigs in 2023 i.e four rigs can be operating today for what it cost 16 years ago.
  2. Four rigs drilling means 300 oilfield workers employed (instead of 75 on one rig). This is direct labor. We know how many mouths get fed when 300 workers are employed instead of 75.
  3. Four rigs working means higher rig count overall. Higher rig count means more services contracted e.g. wireline, mudlogging, casing and cementing crews etc. This means 4X the number of casing running crews, mudlogging crews, wireline crews etc needed (as well as the number of mouths each of them feed). Simply means higher activity and spend in the sector.
  4. Four rigs working means more reservoir exposure, higher production, higher probability of new discoveries which increases reserves, and translates to higher revenues for the country in form of (a)increased government share of oil production and (b) increased taxes and royalties accruing to the state.
  5. Driving down drilling costs can make the difference between a marginal field holder’s ability to commercialize an asset.

Where there is a will, there is a way

Investments in the Nigerian oil and gas sector declined by 70% between 2017 and 2021 closely correlating with the contraction in production output. Nigeria could only attract $3 billion in investments (approximately 5% of the total investment into the sector in Africa) in the five years between 2017 and 2022 despite having 38% of the continent’s total hydrocarbon reserves. As the government pushes for more transfer of resource ownership to locals via organised acreage farm-outs and International Oil Company (IOC) divestments, Nigeria’s oil industry’s uncompetitiveness is certainly at its pinnacle.

For the sake of the industry some of us love for being the source of our livelihood, the hundreds of thousands of mouths it feeds directly and the hundreds of millions of Nigerians it’s long-term sustainability impacts, pulling the industry (and by extension the economy) back from the brink is not optional, but a matter of feral urgency, a task which rests squarely with the industry regulatory agencies.

Tepid as the implementation has been, the Petroleum Industry Act emboldens the Nigerian Upstream Petroleum Regulatory Commission (NUPRC) to drive cost and capital efficiency in oil industry upstream operations. A total transmutation of NUPRC’s operating philosophy from that of its predecessor agency- DPR (not the business as usual approach) will be required to unlock a $2 Billion a year opportunity in these critical times as the oil industry continues hemorhaging unabated.

Local operators and IOCs continue to battle a worsening capital drought and industry contraction. Stakeholders who will be convening in the nation’s capital on the 26th and 27th of June at the NUPRC organised industry consultative workshop will be seeking guidance from their hosts, curious to learn what fresh ideas will be unveiled that will provoke the cataclysmic actions to stem the existential crisis confronting the sector.

Current realities provide the impetus to institute a deliberate drilling cost reduction initiative in Nigeria. Effort should be made to sustainably reduce well delivery costs across all joint venture, sole risk and production sharing contract (PSC) operations for the lifeline it offers to an industry literally tethering on life support.

Operators deserve insights and answers to these critical questions; which ironically can be extracted from gigabytes of drilling data in PDFs, and in thousands of hard copy folders sitting in dusty cabinets in NUPRC’s warehouses.

a. Who are the best-in-class / top quartile Nigerian operators across key performance metrics – (drilling efficiency (speed) and cost in each terrain?
b. What are the performance gaps between their own wells and the best in class wells?
c. What are the causative factors for the discrepancies in performance (gap) between their wells and the best in class wells?
d. What can they do to close the gaps and pull up their performance towards the best in class?

While they scratch their heads searching for answers, we recommend the regulator urgently institute performance improvement programs that leverage latest computing technologies as well as abundance of human capital to drive the systematic optimisation of drilling programs and entrenchment of commercial sustainability across the breadth of Nigerian drilling operations. This will serve as an economic stimulus by lowering all key metrics including unit operating, as well as finding and development costs. It will improve the fiscal breakeven price of oil.

There is no standing still. We are either growing or dying and since we are not growing, as established by all indices, we challenge the custodians of this atrophying industry to lead, follow or simply get out of the way.

The author is CEO of Ofserv, an E&P technical services and consultancy company based in Nigeria.

Read more

NNPC and TotalEnergies announce $550m investment in Nigeria’s Ubeta Gas Field

The Nigerian National Petroleum Corporation and TotalEnergies have announced a $550 million investment decision for the development of the Ubeta Field, a key onshore gas project expected to provide feedstock to Nigeria LNG – Africa’s biggest LNG export terminal. The project is located within OML 58, a TotalEnergies-operated onshore license that frequently suffers production disruptions due to pipeline vandalism and crude theft. The Ubeta field, discovered in 1964 and located northwest of Port Harcourt in the Niger Delta, is projected to produce about 350 million standard cubic feet (MMscf/d) of gas and 10,000 barrels of associated liquids daily. This development is expected to contribute significantly to the supply for NLNG’s Train 7. “Ubeta is the latest in a series of projects developed by TotalEnergies in Nigeria, most recently Ikike and Akpo West. I am pleased that we can launch this new gas project which has been made possible by the Government’s recent incentives for non-associated gas developments,” TotalEnergies’ Senior Vice President for Africa, Exploration & Production, Mike Sangster, said in a company statement. “Ubeta fits perfectly with our strategy of developing low-cost and low-emission projects, and will contribute to the Nigerian economy through higher NLNG exports.” At the official signing event at NNPC Towers, Group CEO Mele Kyari expressed appreciation for the Tinubu administration’s support in fostering a conducive fiscal environment that has been instrumental in reaching this significant FID. “The Presidential Executive Order is instrumental to us getting to this significant milestone, and we are now seeing the impact of the policy,” Kyari said. Slated for a 2027 start-up, the Ubeta gas condensate field in OML58 will be developed with a six-well cluster connected by pipeline to the existing Obite treatment plant. The development plan includes a 5 MW solar plant and electrification of the drilling rig to reduce carbon intensity. TotalEnergies and NNPC are also focusing on local content, with more than 90% of manhours expected to be worked locally. The Ubeta Field’s FID marks a significant step in NNPC’s ongoing efforts, supported by the executive branch, to address the challenges that have historically hindered foreign investment in Nigeria’s oil and gas industry. The project is expected to stimulate economic growth, create job opportunities, and generate substantial value for various stakeholders.